Latest News

      See all latest news >

News
 

Provide Consultancy Services for Hjama Sawa Railway Project

Date: April 22, 2008

In order to update and expand the current Iraqi Railways lines, IRR have signed a contract with joint venture of (Al-Burhan Group, Dorsch Consult and ETC Transport Consultants) to provide detailed design and tender documents for Hjama – Sawa Railway Project to upgrade the single line to double line.

The existing single railway line with a total length of 17km, consist of:

  • 5 Railway Bridges
  • 2 Road bridges
  • 23 Box Culverts
  • 20 Pipe Culverts

In the beginning of the eighties of the last century, SOTECNI an Italian consultant signed a contract with the State Company for Implementation of Transport & Communication / Iraqi Ministry of Transport to provide a consultancy services for Mussayeb – Kerbala – Samawa which pass through Hjama – Sawa Railway sector. The services was involved in preparation of soil investigation, surveying and hydrological data. in preparation of soil investigation, surveying and hydrological data.

Between (1981 – 1984), IRCON International Limited / India, have been awarded a turn-key project to construct the single high way line of Mussayeb – Kerbala – Samawa.

Al-Burhan Group, DORSCH CONSULT Verkehr und Infrastruktur GmbH and ETC Transport Consultants GmbH have set a methodology to perform this project by preparing the satellite images for the alignment and according to this a further detailed survey will be performed and soil investigation will be made to prepare the railway track which will be parallel to the single line.

 

 

Print This Page

 
Set As HomePage