|
|
Ganger Trolleys en route to Iraq |
|
|
Al-Hartha Power Station rehabilitation work commences |
|
|
Al-Burhan Group establishes office at Baghdad International Airport |
|
|
Kershaw Sand Removal Machines delivered to Iraqi Republic Railways |
|
|
Concrete Sleeper Factory almost complete |
|
|
Baghdad Loop Line Consortium |
|
|
Start of negotiations for the security operations of Najaf International Airport |
|
|
Iraqi Ministry of Electricity delegation meets TECHNOPROMEXPORT in Moscow, Russia |
|
|
Signed a annex to deliver 40,000 concrete sleepers to Iraqi Republic Railway |
|
|
Signed contract to supply 8 Ganger Trolleys (AGS-1) from Muromteplovoz JSC |
|
|
Al Burhan Group signed a contract to supply a set of 300,000 Pandrol Fastclips |
| |
|
Kershaw’s Sand Removal Machines to join the IRR’s fleet of railway maintenance vehicles |
| |
|
Delivery to IRR of the first batch of insulators for Pandrol Rail Fastenings (PR607a) |
|
|
Rehabilitation of the Iraqi Republic Railways rolling stock |
|
|
G4S have been awarded the security contract of BIAP |
|
|
TPE Delegation Visits Al-Youssifiyah Power Project and Meets With Senior MOE Officials |
|
|
RMS representative visited Baghdad from 09.10.2009 to 11.10.2009 |
|
|
ABG have a strategic meeting with TPE in Moscow |
|
|
Delegation from TPE & ABG have visited Hartha Power Plant |
|
|
ABG and TPE meet in Paris |
|
|
Training Program for 27 Iraqi Republic Railways (IRR) engineers in Dorsch offices in Munich |
|
|
SKAKO representative’s visit to Baghdad, Iraq from 05.07.2009 to 08.07.2009 |
|
|
Delegation of Iraqi Republic Railways visited Geismar Company |
|
|
Visit Rolls-Royce during the Paris Air show (Le Bourget 2009) |
|
|
Future vision of Technopromexport in Iraq Electricity Sector |
|
|
Participation in the investment conference in London (29 – 30 April 2009) |
|
|
Signed contract of Al-Hartha Power station |
|
|
Training Program for Iraqi Republic Railways (IRR) Engineers on Harsco’s
‘Tamping Machine Mark VI’ |
|
|
Training Program for Iraqi Republic Railways (IRR) Engineers on Pandrol’s Clipping Machines Mark 4a |
|
|
Training Program for Iraqi Republic Railways (IRR) engineers in Dorsch offices in Munich |
|
|
Signed a contract to supply Nylon Liner Insulator for (PR607a) rail Fastenings |
|
|
Signed a contract for the surveying of Basrah - Fao railway project |
|
|
Technopromexport and AlBurhan Group meeting with Ministry Of Electricity delegation |
|
|
ABG meets Dorsch DC to discuss Iraqi Republic Railway projects in Istanbul |
|
|
Analysis of the extent of damage to the Al-Fat ha Bridge |
|
|
The commencement of the rehabilitation of Abu Grahib Concrete Sleepers Factory In Baghdad |
|
|
Assist the Russian Company "Technopromexport" in the completion of Al-Youssifiya Power Station |
|
|
Sign a contract to supply 2 Sand Removal Machines |
|
|
Preparation of Studies and Design for Reconstruction of Al Fat-ha Railway Bridge Project |
|
|
Provide Consultancy Services for Hjama Sawa Railway Project |
|
|
Link Iraq and Jordan with Railway Line |
|
|
Rehabilitation of Al-Hartha Power Plant |
|
|
Delivery of 200,000 concrete sleepers |
|
|
Update the Design of 9 Railway Projects |
|
|
Supply of HTT Spare Parts |
|
|
Supply of 4 HTT Tamping Machines |
|
|
Supply of 2 Track Laying Machine (Platov) From Russia |
|
|
Iraqi agency signed with PANDROL - UK |
|
|
Latest delivery to Iraqi Republic Railway Company (IRR) |
|
|
Complete the delivery of 30 Locomotives |
| |
|
|