Rebuilding Iraq - Electricity - Iraqi Local Partners - PEW  
 

Over View Health & Safety Plan | QA/QC Program

PEW cover the following :

A) Mechanical works:
1. Erection, repairing, rehabilitation of the steam and gas turbines and carrying out the general maintenance with the capability of studying the problem that it is exposed to it and find the suitable solutions that secures its return to work with high efficiency.

2. Erection, repairing , rehabilitation of steam boilers and carrying out the general maintenance with the possibilities to diagnose faults in order to find suitable solutions to secure high efficiency.

3. Erection, repairing, rehabilitation of Heat Exchangers and Valves

4. Construction work to cover the installation of the GTG as well as the Mechanical Balance of for Gas power Plant projects.

  

B) Electrical works:
1. Construction work to cover the Electrical Balance of Plant for Gas power projects.

2. Erection of substations and repairing its components.

3. Erection of high voltage towers and re-constructs the electrical network related to them.

4. Erection and maintenance of all appliances and the electrical engines.

5. Erection and maintenance of all electrical transformers for all capacities.

C) Civil Works:
Construction of all power plants civil work such as machines foundations, Industrial buildings switchyard foundations, cable trenches, steel structures, concrete water tanks, sheds and housing.

D) Automatic Control Works:
Erection and maintenance to diagnose the trouble in the automatic control appliances, measurements and wiring.

  

E) Telecommunication:
Installation and maintenance of PLC, MW, RTU, DAS & SCADA systems.

F) Chemical works:
1. Executing the chemical washing works for all capacities of steam boilers.
2. Erection of the water treatment units and supervision on its operation and for all capacities

Offices:
Baghdad Office (Head office)
Basra Office (Branch office)
Najaf Office (Branch office)
Amman (Branch Office)
London ( Branch Office)

Back to Top

  

Key personnel

Name

Previous experience

Maki.M. Al-Faiz

Former D.G. of General Company for Electrical Production
Director General of Hartha Power StationD.G. Mussayed
Power Station, D. G. Baiji Power Station
Operation and maintenance engineer in Hartha and
Najibiya Power Station

Raed Mohsum

Acting superintendent of Baiji Power station
-Boiler maintenance engineer
-Chief of maintenance section Bajiji Power Station

Osama s.Al-Shammiry

Chief of mechanical maintenance section of Baiji Power station (6x220MW) & Al-Shemal thermal power plant project (4x350MW)

Turbine eng. Of Baiji thermal power plant

Ibrahim Haider Saleh

Chief engineer authorized inspector for mechanical work for nuclear, oil and electricity

Adel M. Ghelan

Director general of electrical network of south
Operation chief engineer in Hartha Power Station
Electrical maintenance engineer in Hartha Power station

Yacoub Yousif Mohammed

Director of communication.. & data Transmission Administration/south region.

Responsible for maintenance, repair  and installation of various communications and data transmission equipment in the south region

Abd Al-Jabbar Al-Khafajy

Electrical chief Engineer, Manager of Um Al-Qura Company

Project Manager of many electromechanical projects in Iraq

  

 

Work Force

Engineers No.

1. Electrical engineers 8
2. Chemical engineer 1
3. Civil engineer 7
4. Construction inspectors 4
5. Mechanical engineers 12
6. Boiler and heat exchangers 3
7. Rotary machines engineer 3
8. Turbine engineer 4
9. Electrical supervisor 1
10. Welding engineer 2
11. Material engineer 1
12. Air conditioning engineers 2
13. Pressurized vessels & piping net with accessories Engineers 3

Labourers & Technicians                                                        No.
 
1. Argon welder                                                                      18
2. Arc welder                                                                          40
3. Rotary machine technician                                                   5
4. Pipe fitter                                                                             30
5. Valve fitter                                                                           5
6. Electrical                                                                              30      
7. Unskilled workers                                                                60
8. MIG welder                                                                           2
9. Electrical supervisor                                                             10

 

    1. Engineers : 51
    2. Administrative : 8
    3. Labourers & Technicians : 200

 -Total : 259 employees

Back to Top

  

Projects

Scope of work

Location

   Start

Al Najaf project

-Construction work cover the erection of GTG, Mechanical and Electrical Balance of plant. The project consist (2 units GE frame 9E) with all auxiliaries and BOP

-The Mechanical Balance of Plant include fuel tanks and pumping system, boilers, fuel treatment plant, water treatment plant and fire fitting system

-The Electrical Balance of Plant includes 132kV Switchyard (9 Bays), Power Transformers, Generator Circuit Breakers, bus Dusts, Switchgears, Control containers, Protection and Metering, Unit control and DC system

- Control and monitoring system, communication and SCADA system

-Testing , Pre commissioning and commissioning of the two units GE frame 9E for AlNajaf Gas Power Plant

Najaf

Jan. 2008

AlKaramah Project-UNDP

Rehabilitation of AlKaramah Water Treatment Plant (227,300 m/Day), as well as upgrading  the water tank, pumping system, chlorination and electrical switchgears

Baghdad

Oct. 2007

AlQudus Expansion Project

-Civil work for 400KV switch yard (foundations for gantries and foundations), 400KV cable trench and Medium & Low voltage cable trenches at Al-Qudus Expansion Project

-Installation of 400KV Switchyard, Power Transformer, Generator  Circuit Breakers, Bus Dust, Switchgears, Control Containers, Protection and Metering, Unit control and DC system of Al-Qudus Expansion Project (2 units GE frame 9E)

-Laying and termination of 400KV XLPE cable as well as MV and LV cables

 

Baghdad

Oct. 2007

Engineering and Consultant services

PEW involves in several projects to cover services such Engineering work, Owner Engineer Activities, On-site supervision and Consulting and Professional Services. These services are provided via the main contractor (ELC-Electroconsult S.P.A. – Italy) to the World bank and The Ministry of Electricity in Iraq

 

All Iraq

 

Jan. 2008

  

References

 Client Name

Location

Start/End

Ministry of Electricity, Iraq
Training course to 5 administrators and 15 endures in Document Management System (Saperion  Training Courses)

Jordan,
Amman

June, 2008
July, 2008

Washington International, INC
Install Automated Monitoring & Control System, Central Regional Control Centre (SCADA)

Central of Iraq

Oct 2005
Oct 2006

Fluor Amec
Rehabilitation of Nassiriya gas power station

Nassiriya

Jun 2005
Feb 2006

Washington International, INC
Rehabilitation of Baghdad  West substation 400KV

Baghdad

Jul  2005
Jun 2006

Washington International, INC
Rehabilitation of Baghdad East substation 400KV

Diyala

Jul    2005
Oct  2006

Washington International, INC
Instillation of Agarguf 132KV substation

Baghdad

Jul, 2005
Sep 2006

Washington International, INC
Commission of 14 distribution substations 33/11 KV

Diyala & Wassit

Jul  2005
Feb 2006

Ministry of Electricity/Transmission project
Construction of Basra Centre  132KV substation

Basra

Jun  2005
Sep  2005

Jica-Japan, Study team, Amman-Jordan
Survey for Iraq 132/33/11KV substations & power stations

25 location

Mar 2004
Mar 2004

I.E.S (Russian)
Rehabilitation for unit no. 1,2 & 3 at south Baghdad power station unit  no.3 at Dura Power station

Baghdad

May 2004
Jul    2004

Aplitic (Italy)
PH_IP dismantling for turbine no.4 at Hartha Power Station

 

Basra

May2004
May 2004

I.E.S. (Russian)
Guaranty maintenance for two month to the all units in clause 16

Baghdad

Jul 2004
Sep 2004

Washington International, INC
SCADA System assessment with Alghalib company

Iraq
South
Region

Oct 2004
Apr 2005

Iraqi ministry of electricity
Rehabilitation of boiler no.5 in Baghdad south power station

Baghdad

Dec,2004/ Jun,2005

General Company for Rehabilitation of Power Plants
Rehabilitation of boiler no.3 at south Baghdad P.S

Baghdad

Jun 2003
Apr 2003

General Company for Rehabilitation of Power Plants
Rehabilitation of boiler no.2 at south Baghdad P.S

Baghdad

Jul 2003
Jul 2003

General Company For Electricity Projects
Fabrication and MIG welding for aluminium Bus Dust and Bus Bar unit no.2

Baiji

Jul 2002
Jul 2002

General company for Electricity Projects
Boiler repairing of Baqubba hospital re tube and bulges repair and ITG welding

Baqubba

Aug1995
Sep1996

General company for Electricity Projects
Boiler repairing of Hilla hospital, ITG welding

Hilla

Jun 1996
July 1996

Dijeal  Air Base
Rehabilitation for Air conditioning system

Dijeal

Jul  1992
Sep 1992

Mohan Export (India)
Erection of H2-plant in south Baghdad P.S

Baghdad

Dec 1998
Mar 1999

 