PEW cover the following :
|
A) Mechanical works:
1. Erection, repairing, rehabilitation of the steam and gas turbines and carrying out the general maintenance with the capability of studying the problem that it is exposed to it and find the suitable solutions that secures its return to work with high efficiency.
2. Erection, repairing , rehabilitation of steam boilers and carrying out the general maintenance with the possibilities to diagnose faults in order to find suitable solutions to secure high efficiency.
3. Erection, repairing, rehabilitation of Heat Exchangers and Valves
4. Construction work to cover the installation of the GTG as well as the Mechanical Balance of for Gas power Plant projects.



B) Electrical works:
1. Construction work to cover the Electrical Balance of Plant for Gas power projects.
2. Erection of substations and repairing its components.
3. Erection of high voltage towers and re-constructs the electrical network related to them.
4. Erection and maintenance of all appliances and the electrical engines.
5. Erection and maintenance of all electrical transformers for all capacities.

C) Civil Works:
Construction of all power plants civil work such as machines foundations, Industrial buildings switchyard foundations, cable trenches, steel structures, concrete water tanks, sheds and housing.

D) Automatic Control Works:
Erection and maintenance to diagnose the trouble in the automatic control appliances, measurements and wiring.



E) Telecommunication:
Installation and maintenance of PLC, MW, RTU, DAS & SCADA systems.

F) Chemical works:
1. Executing the chemical washing works for all capacities of steam boilers.
2. Erection of the water treatment units and supervision on its operation and for all capacities

Offices:
Baghdad Office (Head office)
Basra Office (Branch office)
Najaf Office (Branch office)
Amman (Branch Office)
London ( Branch Office)

Back to Top

Key personnel
Name |
Previous experience |
Maki.M. Al-Faiz |
Former D.G. of General Company for Electrical Production
Director General of Hartha Power StationD.G. Mussayed
Power Station, D. G. Baiji Power Station
Operation and maintenance engineer in Hartha and
Najibiya Power Station
|
Raed Mohsum |
Acting superintendent of Baiji Power station
-Boiler maintenance engineer
-Chief of maintenance section Bajiji Power Station |
Osama s.Al-Shammiry |
Chief of mechanical maintenance section of Baiji Power station (6x220MW) & Al-Shemal thermal power plant project (4x350MW)
Turbine eng. Of Baiji thermal power plant |
Ibrahim Haider Saleh |
Chief engineer authorized inspector for mechanical work for nuclear, oil and electricity |
Adel M. Ghelan |
Director general of electrical network of south
Operation chief engineer in Hartha Power Station
Electrical maintenance engineer in Hartha Power station |
Yacoub Yousif Mohammed |
Director of communication.. & data Transmission Administration/south region.
Responsible for maintenance, repair and installation of various communications and data transmission equipment in the south region |
Abd Al-Jabbar Al-Khafajy |
Electrical chief Engineer, Manager of Um Al-Qura Company
Project Manager of many electromechanical projects in Iraq |



Work Force
Engineers No.
1. Electrical engineers 8
2. Chemical engineer 1
3. Civil engineer 7
4. Construction inspectors 4
5. Mechanical engineers 12
6. Boiler and heat exchangers 3
7. Rotary machines engineer 3
8. Turbine engineer 4
9. Electrical supervisor 1
10. Welding engineer 2
11. Material engineer 1
12. Air conditioning engineers 2
13. Pressurized vessels & piping net with accessories
Engineers 3
Labourers & Technicians No.
1. Argon welder 18
2. Arc welder 40
3. Rotary machine technician 5
4. Pipe fitter 30
5. Valve fitter 5
6. Electrical 30
7. Unskilled workers 60
8. MIG welder 2
9. Electrical supervisor 10
- Engineers : 51
- Administrative : 8
- Labourers & Technicians : 200
-Total : 259 employees

Back to Top


Projects
Scope of work |
Location |
Start |
Al Najaf project
-Construction work cover the erection of GTG, Mechanical and Electrical Balance of plant. The project consist (2 units GE frame 9E) with all auxiliaries and BOP
-The Mechanical Balance of Plant include fuel tanks and pumping system, boilers, fuel treatment plant, water treatment plant and fire fitting system
-The Electrical Balance of Plant includes 132kV Switchyard (9 Bays), Power Transformers, Generator Circuit Breakers, bus Dusts, Switchgears, Control containers, Protection and Metering, Unit control and DC system
- Control and monitoring system, communication and SCADA system
-Testing , Pre commissioning and commissioning of the two units GE frame 9E for AlNajaf Gas Power Plant |
Najaf |
Jan. 2008 |
AlKaramah Project-UNDP
Rehabilitation of AlKaramah Water Treatment Plant (227,300 m/Day), as well as upgrading the water tank, pumping system, chlorination and electrical switchgears |
Baghdad |
Oct. 2007 |
AlQudus Expansion Project
-Civil work for 400KV switch yard (foundations for gantries and foundations), 400KV cable trench and Medium & Low voltage cable trenches at Al-Qudus Expansion Project
-Installation of 400KV Switchyard, Power Transformer, Generator Circuit Breakers, Bus Dust, Switchgears, Control Containers, Protection and Metering, Unit control and DC system of Al-Qudus Expansion Project (2 units GE frame 9E)
-Laying and termination of 400KV XLPE cable as well as MV and LV cables
|
Baghdad |
Oct. 2007 |
Engineering and Consultant services
PEW involves in several projects to cover services such Engineering work, Owner Engineer Activities, On-site supervision and Consulting and Professional Services. These services are provided via the main contractor (ELC-Electroconsult S.P.A. – Italy) to the World bank and The Ministry of Electricity in Iraq |
All Iraq |
Jan. 2008 |



References
Client Name |
Location |
Start/End |
Ministry of Electricity, Iraq
Training course to 5 administrators and 15 endures in Document Management System (Saperion Training Courses) |
Jordan,
Amman |
June, 2008
July, 2008 |
Washington International, INC
Install Automated Monitoring & Control System, Central Regional Control Centre (SCADA) |
Central of Iraq |
Oct 2005
Oct 2006 |
Fluor Amec
Rehabilitation of Nassiriya gas power station |
Nassiriya |
Jun 2005
Feb 2006 |
Washington International, INC
Rehabilitation of Baghdad West substation 400KV |
Baghdad |
Jul 2005
Jun 2006 |
Washington International, INC
Rehabilitation of Baghdad East substation 400KV |
Diyala |
Jul 2005
Oct 2006 |
Washington International, INC
Instillation of Agarguf 132KV substation |
Baghdad |
Jul, 2005
Sep 2006 |
Washington International, INC
Commission of 14 distribution substations 33/11 KV |
Diyala & Wassit |
Jul 2005
Feb 2006 |
Ministry of Electricity/Transmission project
Construction of Basra Centre 132KV substation |
Basra |
Jun 2005
Sep 2005 |
Jica-Japan, Study team, Amman-Jordan
Survey for Iraq 132/33/11KV substations & power stations |
25 location |
Mar 2004
Mar 2004 |
I.E.S (Russian)
Rehabilitation for unit no. 1,2 & 3 at south Baghdad power station unit no.3 at Dura Power station |
Baghdad |
May 2004
Jul 2004 |
Aplitic (Italy)
PH_IP dismantling for turbine no.4 at Hartha Power Station
|
Basra |
May2004
May 2004 |
I.E.S. (Russian)
Guaranty maintenance for two month to the all units in clause 16 |
Baghdad |
Jul 2004
Sep 2004 |
Washington International, INC
SCADA System assessment with Alghalib company |
Iraq
South
Region |
Oct 2004
Apr 2005 |
Iraqi ministry of electricity
Rehabilitation of boiler no.5 in Baghdad south power station |
Baghdad |
Dec,2004/ Jun,2005 |
General Company for Rehabilitation of Power Plants
Rehabilitation of boiler no.3 at south Baghdad P.S |
Baghdad |
Jun 2003
Apr 2003 |
General Company for Rehabilitation of Power Plants
Rehabilitation of boiler no.2 at south Baghdad P.S |
Baghdad |
Jul 2003
Jul 2003 |
General Company For Electricity Projects
Fabrication and MIG welding for aluminium Bus Dust and Bus Bar unit no.2 |
Baiji |
Jul 2002
Jul 2002 |
General company for Electricity Projects
Boiler repairing of Baqubba hospital re tube and bulges repair and ITG welding |
Baqubba |
Aug1995
Sep1996 |
General company for Electricity Projects
Boiler repairing of Hilla hospital, ITG welding |
Hilla |
Jun 1996
July 1996 |
Dijeal Air Base
Rehabilitation for Air conditioning system |
Dijeal |
Jul 1992
Sep 1992 |
Mohan Export (India)
Erection of H2-plant in south Baghdad P.S |
Baghdad |
Dec 1998
Mar 1999 |