Latest News

      See all latest news >

Concrete - Concrete Sleeper Factory - Systems - Production System - Strand Running Machine
 

Introduction | Sleeper Factory | Daily Production Operations | Systems | Labs | History

Batching System | Production System | Stressing System | Curing System | Air System

1. Casting Machine | 2. Demoulding Machine | 3. Strand Running Machine | 4. Saw Machine

Strand Running Machine

Purpose:
  To lay 16 wires of strand along the preparation area and make it ready to be pulled to the casting area. The strand wire will be attached to anchor plates by wedges before it will be pulled from the cage.
   
Operation:
 
The machine is placed using the crane on the running rail with strand clamping, facing strand packs and is connected to 3 phase supply. The machine is turned on from the control panel. All 16 strands are then placed in clamp jaw. The control panel is used to press motor on, press reverse and adjust speed control to desired speed required until the destination is nearly reached; speed is then adjusted to slow and when the control turn is set to zero the machine will stop. Then stop reverse needs to be pressed. One must press stop for each direction travel on control panel, remove strand from jaws and repeat until finished. When there is sufficient strand in place the machine can be disconnected from power supply and removed.
   
Cycle time:
  60 -70 minutes for each production line.
   

 

 

 

Back to Top

 
Set As HomePage